How to maintain the ZP 5 7 9 series tablet press during use: 1. Regularly check the tablet press parts, 1-2 times a month. The inspection items are whether the worm gear, worm, bearing, pressing wheel, crankshaft, upper and lower tracks and other active parts are flexible and wear-resistant. If defects are found, they should be repaired and used in time.
How to maintain the ZP 5 7 9 series tablet press during use:
1. Regularly check the tablet press parts, 1-2 times a month. The inspection items are whether the worm gear, worm, bearing, pressing wheel, crankshaft, upper and lower tracks and other active parts are flexible and wear-resistant. If defects are found, they should be repaired and used in time.
2. After one use or shutdown, the remaining powder should be removed and the residual powder in each part of the machine should be brushed clean. If the shutdown time is long, the dies must be completely removed, and the machine must be wiped clean. The smooth surface of the parts should be coated with anti-rust oil and covered with a cloth.
3. The maintenance of the tablet press die should be placed in a special box so that the die is completely immersed in oil and kept clean. Do not rust or bruise it. It is best to customize a special box with one box for each specification to avoid mis-installation during use and help to grasp the defect situation.
4. The use site should be cleaned frequently, especially for the manufacture of pharmaceutical and food tablets, it is not suitable to have ash sand and flying dust.
5. Electrical components should be maintained and checked regularly to keep them in good operating condition. Cooling fans should be cleaned of dust regularly with compressed air.
6. Electrical components should pay attention to working environment conditions (temperature, humidity). In a good environment, the service life of the components will be extended.
7. The maintenance of electrical components should be performed by professional technicians, especially the inverter should be handled with more care. Generally, it should be sent to professional manufacturers for repair.
8. Before performing insulation tests on the electrical components of the machine, all the main circuit control lines of the inverter must be removed to avoid damage to the inverter during the insulation test. For the method of performing insulation tests on the inverter separately, see the inverter operation manual.